锂电厂 is located in Tokke Municipality in Vestfold and Telemark County.

  • 1969
    投入使用
  • 42 MW
    装机容量
  • 270.7、妇女
    年生产

The power plant was commissioned in 1969. The main intake is located in Lake Byrtevatn and its water level is regulated by a rock-fill dam approximately 20 metres high.

The power station is located beside the Rukke bridge about five kilometres from the village of Dalen. The power plant's discharge into the Tokkeåi River above Dalen ensures a certain amount of water in the river, though the flow is reduced somewhat due to operation of the plant.

锂电厂 has one generating unit equipped with a Francis turbine, and the installed capacity is 43MW.

The power plant uses a gross height of fall of 352 metres.

锂电厂 is an important hub for electricity supply in Western Telemark, and feeds power to both the local and national grids. In addition to 十大最好的网赌平台, the Vest-Telemark Kraftlag power utility and Statnett are connected here.

康复

锂电厂 has undergone an almost total modernisation including turbine, generator and waterway upgrades, as well as a new turbine regulator and new 控制单元.

升级后, 哪一个是在2016年完成的, the installed capacity was increased by 3 MW to 43 MW. 年生产 was increased by 18 GWh to a total of 243 GWh.

The overall project had five parts: construction, 变压器及设备, 控制单元, waterway and generating unit. A three-winding transformer inside the plant was replaced with a pair of two-winding transformers: a production transformer inside the plant and a grid transformer outside.

The generator and turbine inside the plant were upgraded, along with the tunnel and penstock in the waterway. There is a new 控制单元, a new transformer and a separate transformer building outside. The upgrading of the transformer will also help secure the power supply to the local community.

The plant is located near the Rukkeåi River, which flows into the Tokkeåi River and Lake Bandak. The Tokkeåi River has a very valuable stock of large-sized trout that uses several areas of the river for spawning and growing. The Bandak Delta is also an important habitat for birds and fish. The plant was therefore planned to provide the best possible protection against oil spills.

The standard of some sections of County Road 38 is poor, and four sharp beds were straightened out to ease transporting the transformer to the power plant. The local community is very pleased about this.

 

公司 所有权份额
十大最好的网赌平台 100%
  • Reception building at 锂电厂
    利奥
    粉嫩一步裙Nystad

    Reception building at 锂电厂 inside the mountain.

  • Tunnel into 锂电厂, which is located 400 metres inside the mountain
    利奥
    金正日Ramberghaug

    The power plant is located 400 metres inside the mountain.

  • Top of generating unit at 锂电厂
    利奥
    金正日Ramberghaug

    Top of generating unit at 锂电厂.

Find out more about our activities in 挪威