• 2006
    Entered into operation
  • 22 MW
    Installed capacity
  • 107.5、妇女
    Annual production

The power plant has a total head of 83.7m and the powerhouse is equipped with two Francis turbines, which receive water through a 1,222m long tunnel of 3m in diameter. The RCC dam is 11m high.

 

Esmeralda hydropower plant
Esmeralda hydropower plant. (Photo: 十大最好的网赌平台)
公司 Ownership share
十大最好的网赌平台 81.31%
FUNCEF 18.69%

Find out more about our activities in 巴西