• 2020
    Entered into operation
  • 197 MW
    装机容量
  • 450妇女和
    年生产

Construction of Moglicë HPP started in 2015, and commercial operations were started in 2020.

Moglicë was the second hydropower plant to be completed by Devoll 水电 Sh.A. (DHP), an 阿尔巴尼亚n-registered company, owned and operated by 十大最好的网赌平台.

Devoll 水电 builds, owns and operates hydropower plants in cascade along the Devoll River in southeast 阿尔巴尼亚, based on a concession agreement signed between 十大最好的网赌平台 and the Government of 阿尔巴尼亚.

The dam at Moglice hydropower plant
Moglicë dam and reservoir (Photo: Artan Figu )

Moglicë hydropower plant utilizes a head of 300 metres between 650 and 350 metres above sea level. The approximately 167 metres high dam is an asphalt-core rock-filled structure and is one the highest of its kind in the world. The reservoir has a storage capacity of approximately 380 million cubic metres and a surface area of approximately 7.2平方公里.

The plant receives water through a 10.7 kilometres long tunnel from the Moglicë reservoir and is equipped with two Francis turbine units and a small unit at the toe of the dam. The installed capacity is 197 MW with an average annual production of 450妇女和.

Moglice hydropower plant
The dam at Moglicë hydropower plant (Photo: Eduard Pagrja)

Moglicë hydropower plant is part of the Devoll 水电 Project which consists of development, 规划, construction and operation of both Banja and Moglicë, with a total installed capacity of approximately 269 MW and a planned annual production of approximately 700 GWh.

The concession agreement also includes an option for a third hydropower plant, Kokel.

公司 所有权份额
十大最好的网赌平台 100%